Slurries Friction Losses in Pipes
PUMPING SLURRIES
There are various methods for calculating friction losses when pumping slurries, some more complex than others. The one thing to keep in mind however is that, because of the infinite number of different combinations of particle sizes, which can occur in slurries, it is very difficult to predict correct friction losses by any means. However, the method shown here produces values, which are good enough for short pipelines. More rigorous treatment – and certainly some test work - is required for long pipelines.
There are various methods for calculating friction losses when pumping slurries, some more complex than others. The one thing to keep in mind however is that, because of the infinite number of different combinations of particle sizes, which can occur in slurries, it is very difficult to predict correct friction losses by any means. However, the method shown here produces values, which are good enough for short pipelines. More rigorous treatment – and certainly some test work - is required for long pipelines.
The great majority of solids pumping applications
occur in mining and mineral processing plants where pipelines are
relatively short, say up to a few hundred metres and static heads are
also not excessive, say up to 30 metres. It is usual in such cases to
use some simplified methods for predicting friction losses. In most
cases these calculations produce results that are sufficiently close,
say within 5%, to the actual requirements.
It
is very common in these same plants to use pulley and belt drives
between motors and pumps. The main reason for this is that duties often
change - and mostly upwards - after initial installation. If the pump
speed is not sufficient, it is then only a matter of changing one of the
pulleys to get an increased speed, a higher throughput and, alas, also a
higher power consumption. To cater for such power changes, it is
strongly recommended to select the initial motors with sufficient
reserve power, say some 10% to 20% above the initial calculated
requirement. This extra power is also handy in correcting mistakes which
invariably happen due to uncertainties in friction loss predictions, as
mentioned above. A bigger motor is slightly more expensive but the
confidence it generates is priceless.
For
longer pipelines or for unusual applications, it would take a very
brave and experienced engineer and a very trusting plant owner/operator
to approve the construction of an expensive pipeline based only on
calculations. In all critical cases some amount of test work is
absolutely necessary.
Friction
losses are basically of three types, namely when pumping: (1) liquids,
(2) homogeneous slurries of fine non-settling solids and (3)
heterogeneous slurries of larger (settling) solids.
Liquids
(1) are handled by the Darcy or Hazen-Williams methods. Non-settling
slurries (2) are taken care of by the Bingham slurry method. Settling
slurries (3) are described next.
The first thing we have to determine is the limiting settling velocity VL
for the required mass flow M of solids. Pumping solids at high
concentrations Cw requires small flow rates Q and small pipe diameters
D, and the opposite holds with low concentrations. Usually only one
combination will satisfy the required VL. This is done by means of the Durand method, or by Wilson’s if preferred, or by test work.
To use Durand, proceed as follows:
(1) For a fixed solids mass flow M, select a value of Cv and calculate the corresponding Q.
(2) Select a standard pipe of inner diameter D.
(3) Obtain from the Durand diagram the corresponding VL and multiply it by the pipe cross-section to obtain the limiting flow rate QL.
(4) If Q is some 10 to 15% larger than QL, the pipe diameter is correct and the solids will not settle during pumping.
(5) If Q is equal to or smaller than QL select the next smaller pipe diameter and return to step 3.
(6) If no reasonable pipe diameter satisfies the set requirements, select another value of Cv and return to step 1.
(1) For a fixed solids mass flow M, select a value of Cv and calculate the corresponding Q.
(2) Select a standard pipe of inner diameter D.
(3) Obtain from the Durand diagram the corresponding VL and multiply it by the pipe cross-section to obtain the limiting flow rate QL.
(4) If Q is some 10 to 15% larger than QL, the pipe diameter is correct and the solids will not settle during pumping.
(5) If Q is equal to or smaller than QL select the next smaller pipe diameter and return to step 3.
(6) If no reasonable pipe diameter satisfies the set requirements, select another value of Cv and return to step 1.
The
slurry friction head (in metres of slurry) will be numerically larger
than the water friction head (in metres of water) at the same flow rate
Q.
We
now have a starting point (see Fig.6.2). Static Head Z is here assumed
to be zero. If Z is positive (or negative), it must be drawn as a
straight line, parallel to the bottom of the graph at a distance Z above
(or below) the base. The left point of the water resistance curve then
starts from this Z line instead of from zero.
We
first calculate water pipe friction loss (m water) from the Darcy
diagram at 3 flow rates, plot the points and draw the water resistance
curve through them. Next we mark QL on the base line, draw a
vertical line to the water curve at a and from there a horizontal line
leftwards. We next draw two vertical lines up from the base: one from
0.7xQL to meet the horizontal line at b, the other from 1.3xQL
to the water curve at c. Finally, we draw a square parabola with vertex
at b and tangential to the water curve at c. This is the slurry
resistance curve. Now we mark Q on the base line and draw a vertical
line to intersect the slurry resistance line at d and from there a
horizontal line to the left axis at e, which gives the friction head
loss Hf (m of slurry).
HEBEI TOBEE PUMP CO.,LIMITED
Add:Hi-tech Development Zone | Shijiazhuang City | Hebei Province | China.
Email:Sales@tobeepump.com | Skype:Tobee.pump | Mob:+86-18032034573 | Web:www.tobeepump.com
Add:Hi-tech Development Zone | Shijiazhuang City | Hebei Province | China.
Email:Sales@tobeepump.com | Skype:Tobee.pump | Mob:+86-18032034573 | Web:www.tobeepump.com
评论
发表评论